Title Image
Categories

The City of Grande Prairie begins construction on 68 Avenue this week.

The project includes milling the existing road surface, applying new pavement, spot replacing concrete curb and sidewalks, performing minor repairs to storm sewer infrastructure, re-establishing road line markings and crosswalk lines, and landscaping.

 Project Scope:

  • Location: 68 Avenue between Poplar Drive and Resources Road, and 68 Avenue between 86 Street and the City Limit and some minor repairs on 68 Avenue between 100 Street and Polar Drive.
  • Timeline: Construction is expected to be completed by mid-September, weather permitting. Crews will work from Monday to Saturday.

Traffic and Safety: During the construction period, traffic will be restricted but maintained, with a reduced speed limit of 30 km/h. Motorists should anticipate alternating single-lane traffic within construction zones and are advised to exercise caution, follow signage, and heed directions from flag persons. Short-term road closures may occur, but access for local traffic will be maintained. Pathway and sidewalk access will remain open.

Transit Information:

Transit routes and stops may be affected. Commuters are encouraged to visit the City Transit page at cityofgp.com/transit, use the On Demand app at gpmyride.app.ridewithvia.com, view the Where’s My Ride Bus Tracker, or call 311 for updates and planning their trips.

For additional information on construction projects, please visit cityofgp.com/construction2024 or contact the Access GP via phone at 311 or email at info@cityofgp.com.

The City of Grande Prairie thanks all residents for their patience and cooperation during this period of road work.

Information provided by the City of Grande Prairie

Portal